6-6
TRACK REVOLUTION SPEED
Measure the track revolution cycle time
with the track raised off ground.
Preparation
Adjust the tension of both side tracks to
be equal.
On the track to be measured, mark one
shoe with chalk.
Swing the upperstructure 90
Á
and lower
the bucket to raise the track off ground.
Keep the boom-arm angle between 90 to
110
Á
as shown. Place blocks under
machine frame.
Keep the hydraulic oil temperature at 50
Ü
5
Á
C.
M
M
easurement
Select the following switch positions.
Travel mode switch : 1 or 2 speed
Operate the travel control lever of the
raised track in full forward and reverse.
Rotate 1 turn, then measure time taken
for next 3 revolutions.
Raise the other side of machine and
repeat the procedure.
Repeat steps
Ι
and
Κ
three times and
calculate the average values.
E
E
valuation
90 ~ 110
Mark
4)
(1)
(2)
Η
Θ
Ι
Κ
((3)
Η
Â
Θ
Ι
Κ
Λ
The revolution cycle time of each track should meet the following specifications.
Model
R35Z-7
Travel speed
1 Speed
2 Speed
Standard
19.3
Ü
2.0
10.6
Ü
2.0
Maximum allowable
24.0
13.2
Unit : Seconds / 3 revolutions
((4)
R35Z76MC06
Содержание R35Z-7
Страница 11: ...SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 9...
Страница 143: ...4 10 MEMORANDUM...
Страница 179: ...4 45 No of pin Receptacle connector Female Plug connector Male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 337: ...7 77 Take out ball bearing 3 from shaft 2 Tools required Ball bearing disassembly jig S 8 Completed 31 32 2 3 R35Z77TM32...
Страница 357: ...7 97 Remove lock nut 24 and then boot 27 16 RE18 140 7 RE19 140 7 25038RL02 4...
Страница 368: ...7 108 3 13 12 Install cover 3 to hub and tighten bolts 12 5 R35Z77TJ04...