MAINTENANCE
129
3. Disconnect the straps or chains.
4. Remove the wheel blocks.
5. Check that all switches and accessories are turned
OFF
.
6. Unload the lift truck.
PREPARATION FOR USE
After being transported or stored, the lift truck must be
prepared for use for proper operation. All problems must
be corrected before use of the lift truck, see the
SERVICE
MANUAL
for procedures.
Preparation After Transport
1. Complete the unloading procedures.
2. Inspect the lift truck for damage and missing compo-
nents.
3. Follow the steps in the section CHECKS WITH THE
ENGINE STOPPED.
Preparation After Storage
1. Remove all tape, covers, and preservation materials.
2. Check the lift truck for damage and missing compo-
nents. Repair damage and/or replace missing compo-
nents.
NOTE:
If the lift truck has been stored longer than one
year, all lubricants and fluids must be drained and re-
placed. See the
PERIODIC MAINTENANCE
section for
the procedures.
3. Clean the battery cables and terminals. Check the bat-
tery voltage. If the voltage is not correct, charge battery.
Connect battery cables to battery.
4. Do the procedures in the section EVERY 8 HOURS OR
DAILY.
Property of American Airlines
Содержание S40XM
Страница 8: ...CONTENTS 6 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Страница 10: ...WARNING 8 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Страница 62: ...OPERATING PROCEDURES 60 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Страница 132: ...MAINTENANCE 130 NOTES P r o p e r t y o f A m e r i c a n A i r l i n e s ...