Installing the Server in a Rack
IMPORTANT:
Be sure that the first rail is firmly anchored to the chassis before attaching the
second rail.
3.
Repeat steps 1 and 2 to secure the second rail to the server.
Removing the Power Supplies
To make moving and lifting the server more manageable, HP recommends that all
power supplies be removed from the server. To remove the power supplies, refer to
“Removing a Redundant Hot-Plug Power Supply or Blank” in Chapter 5, “Installing
Hardware Options.”
WARNING: The server is very heavy, up to 44.5 kg (98 lb). To reduce the risk
of personal injury or damage to the equipment:
•
Remove all hot-plug power supplies to reduce the weight of the server
before lifting it.
•
Observe local occupational health and safety requirements and guidelines
for material handling.
•
Get help to lift and maneuver the server.
HP ProLiant DL580 Generation 2 Server Setup and Installation Guide
8-9
HP CONFIDENTIAL
Writer: Karen Hale File Name: i-ch8 Installing the Server in a Rack.doc
Codename: Wave Part Number: 230835-003 Last Saved On: 6/26/03 9:41 AM