Installing the Server in a Rack
Installing the Server in the Rack
To complete the server rack installation:
•
•
•
Load the server into the rack rails.
Attach the cable management system reel assemblies.
Reinstall the power supplies.
Loading the Server into the Rack Rails
CAUTION:
To avoid destabilizing the rack, install servers starting from the bottom of
the rack.
To install the server in the rack:
1.
Pull the inner slide rail forward from each rack rail assembly until it locks into
place
(1)
.
2.
Slide the inner bearing race forward until it stops
(2)
.
Figure 8-7: Locking the inner slide rails into place
8-10
HP ProLiant DL580 Generation 2 Server Setup and Installation Guide
HP CONFIDENTIAL
Writer: Karen Hale File Name: i-ch8 Installing the Server in a Rack.doc
Codename: Wave Part Number: 230835-003 Last Saved On: 6/26/03 9:41 AM