3.3.1 Overall unit dimensions
Boiler without casing and insulation
Fig. 15
UltraGas
®
peak load boiler
Measurements for installation as individual parts
Model
A
B
C
D
E
F
G
H
I
J
K
(125.15)
1520
680
1072
980
1295
1380
1191
1040
140
680
236
(200-300)
1585
790
1422 1330 1355
1445
1260
1390
140
950
316
(350)
1610
970
1530 1420 1380
1450
1272
1480
160
970
377
(400-500)
1810
970
1530 1420 1380
1650
1272
1480
160
970
377
(575-720)
1810
1150
1720 1605 1400
1635
1316
1690
175
1150
408
(850-1150)
1885 1410 2027 1916 1483
1686
1375
2000
199
1410
458
H (720)
1810
1150
1720 1605 1400
1635
1316
1690
175
1150
408
H (1000)
1885 1410 2027 1916 1483
1686
1375
2000
199
1410
458
Required minimum width of door and corridor for bringing in the boiler
The following values are the calculated minimum values
B
K =
x L
T
B
T =
x L
K
B = Boiler width
L = Maximum boiler length
T = Door width
K = Corridor width
150
K
L
B
T
Example calculation for the required corridor width Door width T = 1000
970
UltraGas
®
(400-500) K = 1000x 1531 = corridor width
≥ 1486
21
1
Data related to NCV.
The boiler series is tested for EE/H-settings. With a factory setting of the Wobbe coefficient
of 15.0 kWh/m
3
operation at a Wobbe coefficient of 12.0 up to 15.7 kWh/m
3
is possible without new settings.
2
Data related to NCV.
3
See also notes at “Engineering”.
4
Details for multi-boiler plants (cascade) with common flue gas line: see Hoval UltraGas
®
(250D-2000D).
4 217 215 / 00
UK
TECHNICAL INFORMATION
Содержание UltraGas 1000
Страница 57: ...57 4 217 215 00...