2.3
Fitting the casing
1. Hook the cable duct (1, Fig. 04) into the pins on the
left and right and attach with the middle hexagon nuts
and washers (1a, Fig. 04) already mounted on the
boiler. If there is a side wall support (1b, Fig. 05), turn
outwards to the side.
2. Hook in the side walls (2, Fig. 04) on the boiler and
secure with those outer hexagon nuts and washers
(2a, Fig. 04) already mounted on the boiler. Hook in
the side wall at the bottom on the screw head on the
boiler. Align the side walls centrally, set the clearance
for the electrical box and rear wall. Then tighten hex-
Secure the service pedestal (7c, Fig. 07) in
the folded-up status with pin (1b, Fig. 02)!
3. Attach rear wall (terminal plate 3, Fig. 06) of the termi-
nal box using 4 screws (3a, Fig. 06).
4. Remove the stud (4, Fig. 06) on the left or right. Hook
in the electrical box at the bottom on the side of the
stud. Hold the electrical box (4a, Fig. 06) horizontal
and tighten with the second stud on the opposite side.
Fold the electrical box closed upwards, lift it and hook
it in.
5. Fit trim strips (5, Fig. 07)
-
Open terminal box to fit the top screw (5a, Fig. 08)
-
Close terminal box again to fit the bottom screw
3a
4
4a
3
5
5b
5c
5a
Fig. 06
Fig. 07
Fig. 08
Fig. 04
Fig. 05
1a
1
2
2a
2a
S e i t e n w a n d s t ü t z e
2 1 - U l t r a G a s ( 8 5 0 )
26.11.08 / mosr Seite 1 von 2
1b
Illustration shown without burner
11
4 217 215 / 00
INSTALLATION
Содержание UltraGas 1000
Страница 57: ...57 4 217 215 00...