
2.4
Fitting the pedestal casing
Attach the condensate trap (13, Fig. 10),
which is supplied loose, incl. double nipple
13. Place the condensate box (option) under the boiler
and establish the electrical connection. Make the
condensate drain or connection line according to sep-
arate instructions.
For UltraGas
®
(575-1150):
Fit condensate drain pipe (14, Fig. 10) (supplied with
the boiler)
14. Screw the right and left side walls (12, 12a, Fig. 11)
using the cap nuts already mounted on the boiler foot.
15. Hook in the front (12b, Fig. 11) on the side walls
13a
13
14
Fig. 10
14
4 217 215 / 00
INSTALLATION
Содержание UltraGas 1000
Страница 57: ...57 4 217 215 00...