b. Between 0 and 122 °F / -18 and 50 °C, with relative humidity between 0% and 95%
non-condensing.
c. Must be free of flammable or explosive materials.
4. Maintain at least 6in /152mm of free air on all vented surfaces for cooling.
5. Allow 36in /914mm front clearance for operation and maintenance.
PROCEDURE
PROCEDURE
To rack mount ATevo, first install mounting brackets into rack using proper hardware (not
supplied). Second, mount ATevo onto installed brackets, using supplied kit hardware. Provide at
least 6in /152mm of free air above and below ATevo for cooling. Refer to the following
graphics for rack-mounting configurations.
Rack Mounting: Style-5054 Enclosure
Rack Mounting: Style-5054 Enclosure
HindlePower Inc
ATevo Operations–Single Phase Input–Group II (30-100 Adc Output) - 1_en
Copyright HindlePower Inc. 2021
Page 21 of 171