To configure the voltage set point at which to terminate the test if no battery is present:
‘Setpoint’ > adjust voltage
Last modified: 1 March 2021
9.7.2.
9.7.2. Running Battery Open Tests
Running Battery Open Tests
Running Test Periodically
Running Test Periodically
To schedule periodic Battery Open Tests:
MENU > TESTING > ‘Test Settings’ > ‘Run periodically:’ > ‘Enabled’
‘Every:’ > change desired digits
HindlePower Inc
ATevo Operations–Single Phase Input–Group II (30-100 Adc Output) - 1_en
Copyright HindlePower Inc. 2021
Page 104 of 171