Prerequisites
• Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
• If you are installing a Smart Array P-class Gen10 controller, an energy pack option is required. For
more information, see the chassis user guide on the Hewlett Packard Enterprise website (
www.hpe.com/info/Apollo2000-Gen10-docs
).
• Before you perform this procedure, perform the following steps:
1.
Back up data on the system.
2.
Close all applications.
3. Update the server firmware if it is not the latest revision
.
4.
Do one of the following:
◦ If the new Smart Array is the new boot device, install the device drivers.
◦ If the new Smart Array is not the new boot device, go to the next step.
5.
Ensure that users are logged off and that all tasks are completed on the server.
Procedure
1.
2.
Disconnect all peripheral cables from the server.
3.
Remove the server from the chassis
on page 28.
4.
on page 30.
5.
Remove the secondary riser cage
on page 33.
6.
If installed, remove the full-height bracket from the controller.
7.
Install the low-profile bracket on the controller.
82
Hardware options installation