![GST GST200 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/gst/gst200/gst200_installation-and-operation-manual_2275587017.webp)
GST200 Intelligent Fire Alarm Control Panel
Installation and Operation Manual
The Intelligent Solution
Page 14
Fig. 4-1
4.3 Start-up Check
After installation, apply power to it as shown in Fig. 4-2. Turn on the main and standby
power supply in the cabinet and check if the FACP can self-test. The procedures are as
follows.
Check if the digital displays showing time are illuminated one by one.
Check if the LCD showing system messages such as fire alarm is illuminated.
Check if the LEDs showing the state of system can be illuminated one by one.
Check if the LEDs showing the device state in zone indication and manual
intervention panel are illuminated in turn.
Check if the speaker can give four kinds of obvious loud alarm sounds.
4.4 Connections of Field Devices
4.4.1
Connection of AC Power
GST200 Fire Alarm Control Panel receives power from a 230V, 50Hz supply. The
current flows through a filter to the transformer. The transformer converts the input
mains voltage to 27VAC.
The incoming power feed cable Earth (Green/Yellow) wire should be connected to
the earth terminal.
Connect the neutral wire to the N terminal and connect the live wire to the L
terminal.
Note:
1
)
Do not power the system until the installation is complete.
2
)
The incoming mains cabling to the FACP should be supplied via a suitably
located ‘Isolation’ switch to facilitate servicing.
Содержание GST200
Страница 1: ......