Operation manual SP 9 - Compact
CHAPTER X - ADDITION OF THE SUPPLEMENTARY PLOUGH –- Page 2
7.
Put the non-stop hydraulic circuit under pressure again/ see chapter «9.6.5.4 The
performance of the operations for changing of the pressure of the hydraulic non-stop security
disengagement».
10.3. HOW TO CONTROL THE SUITABLE WORK AND FITTING OF THE
HYDRULIC SECURITY ON THE ADDITIONAL PLOUGH BOTTOM
1.
Fasten the plough into the transporting position and the plough bottom into the
vertical position.
2.
Eliminate the pressure in the hydraulic circuit as it follows:
1.
Open the pipe valve at the end of the
accumulator.
2.
The circuit pressure which is in the connection
with the accumulator eliminate by putting the
distribution lever into self-adjusting position and follow
the instructions about tractor usage.
Attention, by eliminating the pressure in
the security cylinders, the plough
bottoms cannot be kept up and there is
the risk that they may fall down. The
plough must be fastened.
3.
The manometer of the accumulator must show zero.
4.
Every plough bottom must go down one by one.
5.
If the hydraulic connection has been performed properly, the supplementary plough
bottoms should go down as well. If it does not happen we should check the fastening as it
described above.
6.
For accumulator blowing up and the circuit placing under the pressure the tractor
distribution levers should be put into the operation till the manometer indicates in the green
line the required pressure.
Содержание SP9 COMPACT
Страница 2: ......
Страница 8: ......
Страница 10: ...Operation manual SP 9 Compact...
Страница 14: ...Operation manual SP 9 Compact...
Страница 46: ...Operation manual SP 9 Compact...
Страница 54: ...Operation manual SP 9 Compact...
Страница 60: ...Operation manual SP 9 Compact...
Страница 97: ...Operation manual SP 9 Compact CHAPTER XI GREASING AND MAINTENANCE Page 11...
Страница 100: ...Operation manual SP 9 Compact...
Страница 107: ......