Gree GMV6 HR DC Inverter VRF Units Service Manual
36
For the phase with "OK" displayed, a manual confirmation is required for entering the next
commissioning step. In processes "3 Confirm number of outdoor basic modules" and "4 Confirm the
number of IDUs", if the number of online units is consistent with the actual number, click Confirm or wait
for 30 seconds to go to the next process. If the displayed number of online units is inconsistent with the
actual number in the project, manual check and commissioning again are required for confirmation. Click
"
" to display relevant information detected on this phase, which provides references for selection.
Click "Close" to close the information (the number of commissioning units is displayed in "3 Confirm
number of outdoor basic modules" and "4 Confirm the number of IDUs", as shown in the red boxes in the
figure below.)
In step “8 Compressor preheating confirmation”, the current preheat time is directly displayed, as
shown in the red box in the figure below. If the system currently detects that all the basic modules have
been continuously powered on for 2 hours or more, or the previous time when the modules were
powered on for 2 hours or more is less than 2 hours from the current time, preheat is completed and the
system can proceed to the next process. Otherwise, the system prompts UO (insufficient compressor
preheat time).
Содержание GMVVQ1015WM/C-X
Страница 418: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 416 GMV VQ400WM C X GMV VQ450WM C X...
Страница 419: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 417 GMV VQ504WM C X GMV VQ560WM C X GMV VQ615WM C X...
Страница 420: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 418 NCHS1D...
Страница 421: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 419 NCHS2D...
Страница 422: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 420 NCHS4D...
Страница 423: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 421 NCHS8D...
Страница 426: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 424 6 1 2 Heating Operation...
Страница 427: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 425 6 1 3 Main body Cooling...
Страница 428: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 426 6 1 4 Main body Heating...
Страница 430: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 428 6 2 2 Heating Operation...
Страница 431: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 429 6 2 3 Main body Cooling...
Страница 432: ...Gree GMV6 HR DC Inverter VRF Units Service Manual 430 6 2 4 Main body Heating...
Страница 433: ...JF00304244...