IV. Onsite Review of Design Drawing
Installation personnel must carefully read and understand the design scheme and drawings
provided by engineering designers, and prepare detailed and feasible construction organization design
after reviewing the onsite status.
The following aspects of working drawing must be reviewed:
1. The loads of indoor and ODUs must match. The gross rated capacity of the IDU should be set to
a value that is 50% to 135% of the rated capacity of the ODU. In actual conditions, if the capacity of
concurrently operating IDUs exceeds 100% of the rated capacity of the ODU, the air conditioning system
fails to meet the requirement. Note: Configuration in excess of the capacity of the IDUs can affect the
comfort for users. The more the excess is, the lower the adjustment capacity of an air conditioning unit
will be. When the capacity exceeds 135% of the configured value, the system reliability can be affected.
Therefore, relevant regulations on capacity limit must be strictly followed.
2. The difference of level between an ODU and an IDU, and that between IDUs must be set within
the designed range.
3. Pipe bend for trapped oil is required for air pipe riser in the unit to ensure normal circulation in the
unit lubricating system.
4. The pipe diameter and manifold type in the cooling system must meet relevant technical
specifications.
5. The drainage method of unit condensate water must be reasonable; the pipeline slope must
follow the design requirement of unit.
6. The air duct direction and air flow are reasonably organized.
7. The configuration specifications, type, and control method of power cables should meet the
design requirement of unit.
8. The arrangement, total length, and control method of control line should meet the design
requirement of unit.
Note: Engineering construction personnel must strictly abide by the design drawings. If any design
cannot be implemented during construction and needs to be modified, contact the designer first for
approval and prepare a written document, that is, the design modification record.
Содержание GMV-224WM/B-X
Страница 1: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL T1 R410A 50 60Hz GC201508...
Страница 6: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 3 2 Piping Diagram of GMV 400WM B X and GMV 450WM B X...
Страница 27: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 24...
Страница 29: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 26 V Construction Organization Process...
Страница 38: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 35...
Страница 45: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 42 Part 5 Piping Connection Schematic Diagram of Piping Connection...
Страница 47: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 44 GMV 504WM B X GMV 560WM B X and GMV 615WM B X...
Страница 156: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 153 low press ure air pipe...
Страница 158: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 155 2 Low exhaust temperature protection E2...
Страница 159: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 156 3 System high pressure protection E1 4 System low pressure protection E3...
Страница 160: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 157...
Страница 161: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 158 5 System refrigerant lacking protection U4...
Страница 162: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 159 6 System high pressure ratio protection J8...
Страница 163: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 160 7 System low pressure ratio protection J9...
Страница 165: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 162 11 Pressure sensor fault...
Страница 224: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 221 2 Model GMV 335WM B X Exploded View...
Страница 227: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 224 3 Model GMV 400WM B X GMV 450WM B X Exploded View...
Страница 230: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 227 4 Model GMV 504WM B X GMV 560WM B X GMV 615WM B X Exploded View...
Страница 242: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 239...
Страница 248: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 245 Click Finish...
Страница 250: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 247 Check I accept the terms in the License Agreement and click Next...
Страница 254: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 251 Click Next Installing...
Страница 255: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 252 Click Close...
Страница 272: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 269...
Страница 277: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 274 Power input Gateway Running Alarm Power Address Function...
Страница 287: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 284 1 4 2 5 Communication Debug...
Страница 297: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 294...
Страница 300: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 297 11 In the displayed window select I Agree and click Next to continue...
Страница 304: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 301...
Страница 307: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 304...
Страница 315: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 312 After detection detected devices will be listed in the Net tree...
Страница 349: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 346...
Страница 352: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 349 11 In the displayed window select I Agree and click Next to continue...
Страница 375: ...GMV5 DC INVERTER VRF UNITS SERVICE MANUAL 372 JF00302751...