Gree GMV6 DC Inverter VRF Units Service Manual
31
For the phase with "OK" displayed, a manual confirmation is required for entering the next
commissioning step. In processes "3 Confirm number of outdoor basic modules" and "4 Confirm the
number of IDUs", if the number of online units is consistent with the actual number, click Confirm or wait
for 30 seconds to go to the next process. If the displayed number of online units is inconsistent with the
actual number in the project, manual check and commissioning again are required for confirmation. Click
" " to display relevant information detected on this phase, which provides references for selection. Click
"Close" to close the information (the number of commissioning units is displayed in "3 Confirm number of
outdoor basic modules" and "4 Confirm the number of IDUs", as shown in the red boxes in the figure
below.)
Содержание GMV-1015WM/G-U
Страница 212: ...Gree GMV6 DC Inverter VRF Units Service Manual 210 Models GMV 400WM G U GMV 450WM G U GMV 504WM G U...
Страница 229: ...Gree GMV6 DC Inverter VRF Units Service Manual 227 Models GMV 400WM G U GMV 450WM G U GMV 504WM G U...
Страница 234: ...Gree GMV6 DC Inverter VRF Units Service Manual 232...
Страница 264: ...Gree GMV6 DC Inverter VRF Units Service Manual 262...
Страница 325: ...Gree GMV6 DC Inverter VRF Units Service Manual 323 GMV 400WM G U GMV 450WM G U and GMV 504WM G U...
Страница 331: ...JF00304610...