DC Inverter Multi
VRF Service Manual
207
5. Remove the
compressor
● Move the compressor from the chassis.
6. Fix the new
compressor on
the chassis
● Put the new compressor
in the right position.
● Tighten the screws fixng
the compressor.
● The compressor can not be pside-down.
7. Connect the air
inlet and outlet
to the pipeline
●Heat the suction and discharge
pipe by gas welding. Then
remove the compressor.
●It is necessary to charge nitrogen for
welding. The pressure of nitrogen is
0.5±0.1kgf/cm2 (relative pressure)
● Do not burn the surrounding
matters when heating
8. Connect the
power cord, electric
heater and discharge
temperature sensor
Mark the power
cable color and
corresponding
terminal
● Mount the power cord according
to the disassembly sequence.
● Tighten the screws fixing power cord.
● Mount the electric heating tape
and discharge temperature sensor.
9. Mount the
front panel
● Check if the parts and connecting
wires are well connected/
●.Fix the left and right front panels.
Содержание CN851W1000
Страница 1: ...DCINVERTERMULTIVRFSERVICEMANUAL T1 R410A 50Hz GC201107 CENTRAL AIR CONDITIONERS ...
Страница 6: ...DC Inverter Multi VRF Service Manual 1 PRODUCT PRODUCT ...
Страница 24: ...DC Inverter Multi VRF Service Manual 19 CONTROL CONTROL ...
Страница 92: ...DC Inverter Multi VRF Service Manual 87 INSTALLATION ...
Страница 146: ...DC Inverter Multi VRF Service Manual 141 ENGINEERING DEBUGGING ...
Страница 171: ...166 DC Inverter Multi VRF Service Manual MAINTENANCE ...
Страница 201: ...196 DC Inverter Multi VRF Service Manual GMV Pdm335W NaB M GMV Pdm400W NaB M GMV Pdm450W NaB M ...
Страница 233: ...JF00300207 ...