Setup
3A6338F
5
Setup
EFR and PLC Connection
Verify the PLC connection parameters are setup
correctly.
NOTE:
The connection between the EFR and PLC will
not be made if the PLC connection parameters are not
set up correctly.
Gateway Screens
The Gateway screens are used to configure the
fieldbus. If the CGM is correctly installed, the Gateway
Screens will automatically be shown under the
Integration chapter of the ADM. Cycle power to the EFR
once configuration of the CGM is complete. See page 3
for installation instructions.
1. With the system on and enabled, press
to
access the Setup screens.
2. Press the left arrow key once to navigate to the
main Gateway screen. See F
. 7.
PROFIBUS Fieldbus Screens
These screens are shown only if a PROFIBUS Fieldbus
CGM is installed.
Screen 1
This screen enables the user to set the device address,
install date, location tag, function tag, and description.
Screen 2
This screen displays the hardware revision, system
serial number, and data map identification information.
NOTE:
The map identification information should be as
follows:
Map name: EFRCGM_19A796
Map ID: 00001
Map Revision: 001, 001
Map Date: 01/24/2019
Standard Gateway Map: 19A796
Comm. Format
Data-SINT
Input Assembly Instance
100
Input Byte Size
42
Output Assembly Instance
150
Output Byte Size
22
F
IG
. 7: Example Fieldbus Screen
F
IG
. 8: PROFIBUS Fieldbus Screen 1
F
IG
. 9: PROFIBUS Fieldbus Screen 2