Installation
3A6338F
3
Installation
1. Ensure the system power is OFF and pressure has
been relieved. Follow the Pressure Relief Procedure
in the Electric Fixed Ratio Proportioner, Setup -
Operation manual.
2. Remove the pump yoke shroud (F) and frame cover
(G) from the EFR system.
3. Mount the CGM Kit (A) inside the system frame with
two screws (B) and washers (C).
4. Secure the CAN cable (CAN) and the fieldbus cable
(FB) to the frame using the cable ties (H) provided,
and route them through the protected opening as
shown in F
WARNING
ELECTRIC SHOCK HAZARD
To avoid electric shock, make sure the
system power is OFF before connecting or
disconnecting CAN cables.
PRESSURIZED FLUID HAZARD
This equipment stays pressurized until
pressure is manually relieved. To help
prevent serious injury from pressurized
fluid, such as skin injection, splashing fluid
and moving parts, follow Pressure Relief
Procedure when you stop spraying and
before cleaning, checking or servicing the
equipment.
PERSONAL PROTECTIVE EQUIPMENT
Wear appropriate protective equipment
when in the work area to help prevent
serious injury, including eye injury, hearing
loss, inhalation of toxic fumes, and burns.
F
IG
. 2
F
E
G
F
IG
. 3
F
IG
. 4
A
B
C
CAN
H
FB