GMC-I Messtechnik GmbH
91
–
Momentary line voltage at the test
instrument is outside of the permis-
sible range (110 to 120 V or 220 to
240 V) for a 10 A/25 A R
PE
mea-
surement.
➭
The 10 A/25 A R
PE
measurement
is only available when line voltage
is between 220 and 240 V at 50 or
60 Hz, or between 110 and 120 V
at 50 or 60 Hz.
➭
If you’re using the test instrument
in an electrical system which does
not lie within one of these voltage
ranges, use the 200 mA test cur-
rent in order to determine protec-
tive conductor resistance.
–
IT system option (see section
4.1.1, “Measurements in IT Sys-
tems”) is activated. An attempt has
been made to start an active leak-
age current measurement or a
measurement with reference to PE
at the mains connection end (or a
test sequence which includes such
measurements).
➭
Select measurement type “pas-
sive”.
or
➭
Conduct the desired tests in a TT/
TN system instead of an IT system
and configure the test instrument
accordingly.
or
➭
Deactivate leakage current mea-
surements in the sequence param-
eters if possible.
Connection Error at the Applied Part Connections
–
At least one of the two fuse links
for applied part connections A
through K is missing or defective.
–
Test results are invalid.
➭
Stop the test.
➭
Disconnect the test instrument
from the mains.
➭
Check the fuse links for the applied
part connections.
–
In the event that this message does not
just appear briefly, but rather persists
uninterruptedly:
At least one of the two fuse links
for applied part connections A
through K is missing or defective.
➭
Stop the test.
➭
Disconnect the test instrument
from the mains.
➭
Check the fuse links for the applied
part connections.
Error Messages
Possible Causes
Corrective Measures
Содержание SECULIFE ST PRO
Страница 101: ...GMC I Messtechnik GmbH 101 ...