R
EVISION
:
-
D
ATE
:
12/29/04
P
AGE
:
24
Copyright
2004 Glasair Aviation, LLC Arlington, Washington All rights reserved
forward stabilizer attach bracket and aft stabilizer attach nutplates.
Z. Check all aft-fuselage drain holes for obstructions.
AA. Inspect the tailwheel spring attach brackets for integrity and
security.
BB. Reinstall the forward and aft inter-bulkhead shearwebs and the
stabilizer. Reattach the elevator pushrod and the trim system.
CC. Check the elevator and the rudder for proper travel:
1. Elevator: 23° up and 20° down (
±
1°).
2. Rudder: 25° left and right (
±
1°).