PROCESS DESCRIPTION
Gentherm Global Power Technologies
Page 18
To enable temperature compensation:
1.
Ensure that a lead acid battery is part of the customer load connection circuit.
2.
Set the SW1 dip switches on the regulating limiter board to the following positions:
SW1
–
switch 1
SW1 - switch 2
Temp Comp ON
OFF
ON
Temp Comp OFF
ON
OFF
NOTE:
The regulating limiter board has an on-board temperature sensor which is
either switched into or out of the operation. The output voltage will be
adjusted by the effects of the temperature being measured on the board.
If the optional TEG Controller board is installed and system measurements
desired to be used for start/stop control, an optional external temperature
sensor can be attached to one of the posts of the battery. Note: there is no
effect to the output voltage with this external temperature sensor.
NOTE:
If a battery is connected to the TEG without the blocking diode, then the TEG
will draw power from the station battery if the TEG is off.
4.4
BLOCKING DIODE
A Blocking Diode is integrated into the C/L to allow multiple generators to be connected in
parallel, or to allow one or more generators to be combined with alternative energy sources.
It is connected in series with the output to prevent current from flowing back into the
electronics from another power source.
Figure 8 - CP Interface System General Assembly