Installing the Dampening Material, Transducers and Fixtures
3-27
April 2009
Installing DMP-1 Dampening Material with CFG-V
Series Fixtures (cont.)
7.
With a marker, trace around the transducer footprint, as shown
in Figure 3-24 below.
Figure 3-24: DMP-1 Material with
Transducer Footprint Traced
8.
Remove the fixture and transducers. Then use a utility knife to
cut out the area under the transducer footprint, and peel the cut
material off the pipe, as shown in Figure 3-25 below.
Note:
Remove excess dampening material as soon as possible,
before it adheres to the pipe and becomes difficult to
remove.
Figure 3-25: DMP-1 Material with
Transducer Footprint Cut Out
9.
To remove any residual adhesive, clean the cut-out area with a
rag or a piece of sandpaper, or use varnish remover.
10.
Reinstall the fixture and transducers on the pipe.
Содержание TransPort PT878GC
Страница 1: ...GE Sensing Inspection Technologies TransPort PT878GC Portable Gas Flowmeter User s Manual ...
Страница 29: ...Initial Setup 2 13 April 2009 Keypad cont Figure 2 7 The TransPort PT878GC Keypad ...
Страница 208: ...April 2009 9 4 Servicing the PT878GC Printing Reports cont Figure 9 3 Printout of a Typical Drive Report ...