Installing the Dampening Material, Transducers and Fixtures
3-23
April 2009
Installing the Second Bracket (cont.)
The spacing should now appear similar to that shown in Figure
3-21 below.
Figure 3-21: The Installed CFG-PI Fixture,
with Calculated Spacing
Installing the Transducers
1.
Check to be sure the second CFG-PI holder bracket is
correctly positioned.
2.
Apply a bead of CPL-16 couplant 6 mm (0.25 in.) wide on
each transducer face. (See Figure 3-22 below.)
Figure 3-22: Couplant on Transducer Face
S
Содержание TransPort PT878GC
Страница 1: ...GE Sensing Inspection Technologies TransPort PT878GC Portable Gas Flowmeter User s Manual ...
Страница 29: ...Initial Setup 2 13 April 2009 Keypad cont Figure 2 7 The TransPort PT878GC Keypad ...
Страница 208: ...April 2009 9 4 Servicing the PT878GC Printing Reports cont Figure 9 3 Printout of a Typical Drive Report ...