System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
86
2-3
SG 60 Operational Tests
Test all movements, functionalities and limit positions. Refer to Operator Manual 2150272, Chapter 3:
Vertical Positioning
page 3
−
1
Cassette Tray
page 3
−
3
Grid Oscillation
page 3
−
10 (during preparation)
2-4
SG 100 Operational Tests
Test all movements, functionalities and limit positions. Refer to Operator Manual 2150275, Chapter 3:
Vertical Positioning
page 3
−
1
Patient Support Legs
page 3
−
2
Bucky Rotation
page 3
−
3
Bucky Angulation
page 3
−
4
Cassette Tray
page 3
−
7
Grid Oscillation
page 3
−
5 (during Preparation)
2-5
XT Suspension Operational Tests
Test all movements, functionalities and limit positions. Refer to Operator Manual 2116790
−
100:
Overhead Rail System
Section 2
Telescopic Column and Carriage
Section 2
Longitudinal and Transverse Detents
Section 2
Lock Operation
Section 2
2-6
RS 85 Tubestand
Test all movements, functionalities and limit positions. Refer to Operator Manuals 03277324, 03277341,
03277361, 03277303, 03277351 and 03277371.
2-7
Ultranet SM Collimator
Test all movements, functionalities and limit positions. Refer to Operator Manual 2144901:
Continuous Rotation of the Collimator
Chapter 3
page 3
−
6
Rotation of the Tube Unit/Collimator Assy
Chapter 3
page 3
−
6
Knobs, Buttons, Sensitive Handle
Chapter 4
page 4
−
13
Light Beam Centering Device
Chapter 4
page 4
−
16
Tape Measure
2-8
Ultranet SA Collimator
Test all movements, functionalities and limit positions. Refer to Operator Manual 2144901:
Continuous Rotation of the Collimator
Chapter 3
page 3
−
6
Содержание Compax 40CE
Страница 138: ......