System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
18
INSTALLATION
Step
Description
Done
Supporting Documents
ÍÍ
ÍÍ
From previous page
Continues on next page
ÍÍ
ÍÍ
See SM
−
RS 85 Dir. 0327 7223
Mounting Instructions Chapter 1 Section
1.6.1 (Overall dimensions) and:
Chapter 2, Section 2.4
RS 85
with/without
without
with
Tube Stand Rail
2 People
Column With Carriage
If present, RS 85 Tube Stand must be
installed first. Follow instructions given in
RS 85 PIM, Dir 2172805
−
100, Chapter 2.4
RS 85 INSTALLATION
Counterweights
Chapter 2 sections 2.5 thru2.6
Tube Support Arm
A7
XXHrs
CAUTION:
X
−
Ray Tube and Collimator are
factory aligned and assembled during HLA.
The mounting ring should be
not
be
adjusted during installation .
See Job Card IST003 of this manual
HANDLE with CARE (by the support only).
See SM
−
RS 85 Dir. 0327 7223
Installation & Service Instructions
ÍÍ
ÍÍ
H
X
−
ray Tube with Adapter
Collimator Assembly
HV Cable Routing
INSTALLATION
2 People
A8
Chapter 2, Section 2.3 (Adjust floor rails)
Refer to Inspection Report 2172166 TDR,
sections 1.1 and 1.2
Column Cables Wall Box
Refer to Inspection Report 2172166 TDR,
sections 3.1 and 2.1
Содержание Compax 40CE
Страница 138: ......