System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
19
ALIGNMENT
Step
Description
Done
Supporting Documents
Í
Í
Mark each box when done
From previous page
Continues on next page
A 10
Í
Collimator cable
Lock Cable
Column Cable concealment
A9
INSTALLATION
ÍÍ
ÍÍ
See RS 85 Mounting Instructions, SM Dir.
0327 7223. Chapter 1, Section 1.7, Chapter
2 section 2.9 and Chapter 3 sections 3.1
thru 3.3 and 3.5.
See RS 85 Interface Kit for Compax 40E CE;
SM Dir.2165897
−
100, Chapter 1 Installation,
Chapter 2 MIS MAP and Chapter 3 MIS
CHART
REMARK
: Most of these cables are already
factory connected.
See MIS MAPS, Chapter 5 of this manual, and
MIS CHART in section 1-4-3 this chapter.
MIS No. 27304
1 Person
1 Person
A7
−
A10= 8 Hours
CONNECTIONS
Counterbalancing & Leveling
See Job Card IST 005 for cable clamping
Í
Í
COMPAX 40E TABLE INSTALLATION
See SM COMPAX 40E CE, Dir. 2150299
−
100,
Chapter 1, Section 3.
INSTALLATION
2 People
Table Base Longitudinal Axis Alignment with:
XT Longitudinal Rails
(or) RS 85 Longitudinal Rails
Table Base Installation and leveling
Tabletop Installation
ÍÍ
See SM COMPAX 40E CE, Dir. 2150299
−
100,
Chapter 1, Section 3.2
A11
−
A12 = 4 Hours
2 People
A 11
A12
NOTE:
Precise alignment is extremely
important for Tomographic Performance.
Refer to Inspection Report 2179651 TDR
or 2167647 TDR sections 4.1 and 4.3
or
Inspection Report 2172166 TDR
sections 4.1 and 4.8
See Job Card IST003 for Cable concealment
Содержание Compax 40CE
Страница 138: ......