System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
20
WALL BUCKY INSTALLATION
WALL
BUCKY
with/without
with
without
See SM Vertical Bucky Stand SG 100 CE
−
Dir 2150297
−
100, Chapter 1 or SM Vertical
Bucky Stand SG60, Dir 2150293
−
100
Chapter 1.
Step
Description
Done
Supporting Documents
ÍÍ
ÍÍ
Mark each box when done
From previous page
WALL
MOUNTING
KIT
with
without
REMARK:
Use of the Wall Mounting Kit is optional
but strongly recommended with certain kinds of
Hospital wall construction (Unistrut wall). Refer to
SG60 PIM 2150301
−
100 or SG100 PIM 2150305
−
100
.
INSTALLATION
2 Hours
1 Person
Mounting Hardware Kit
ÍÍ
ÍÍ
See SG60 SM 2150293
−
100, Job Card IST001
or SG100 SM 2150297
−
100, Job Card IST001
ÍÍ
2 People
2 Hours
SG60/SG100 Installation
Vertical Leveling
Route System Cables from SG to MPH
Cabinet location
Lateral alignment across the wall to Table
Longitudinal Axis
INSTALLATION
SG60: MIS 5.1
SG100: MIS 5.1
−
9
Continues on next page
A16
A17
REMARK:
Most of these cables are already factory
connected. See MIS MAP / MIS CHART of this
Manual (section 1
−
4)
.
Connections to be done during Installation:
A17
Refer to Inspection Report 2179651 TDR
or 2172166 TDR sections 6.1, 6.2 and 6.3
or
Inspection Report 2167647 TDR,
sections 5.1, 5.2 and 5.3
Содержание Compax 40CE
Страница 138: ......