5-272
L60 Line Phase Comparison System
GE Multilin
5.6 CONTROL ELEMENTS
5 SETTINGS
5
•
BRK 1 FLSHOVR SPV A
to
BRK 1 FLSHOVR SPV C
: These settings specify FlexLogic operands (per breaker pole)
that supervise the operation of the element per phase. Supervision can be provided by operation of other protection
elements, breaker failure, and close and trip commands. A six-cycle time delay applies after the selected FlexLogic
operand resets.
•
BRK FLSHOVR PKP DELAY
: This setting specifies the time delay to operate after a pickup condition is detected.
Содержание L60
Страница 10: ...x L60 Line Phase Comparison System GE Multilin TABLE OF CONTENTS ...
Страница 57: ...GE Multilin L60 Line Phase Comparison System 2 27 2 PRODUCT DESCRIPTION 2 3 SPECIFICATIONS 2 ...
Страница 58: ...2 28 L60 Line Phase Comparison System GE Multilin 2 3 SPECIFICATIONS 2 PRODUCT DESCRIPTION 2 ...
Страница 100: ...3 42 L60 Line Phase Comparison System GE Multilin 3 3 DIRECT INPUT AND OUTPUT COMMUNICATIONS 3 HARDWARE 3 ...
Страница 482: ...6 26 L60 Line Phase Comparison System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Страница 554: ...10 8 L60 Line Phase Comparison System GE Multilin 10 2 BATTERIES 10 MAINTENANCE 10 ...
Страница 674: ...B 110 L60 Line Phase Comparison System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Страница 704: ...C 30 L60 Line Phase Comparison System GE Multilin C 7 LOGICAL NODES APPENDIX C C ...
Страница 720: ...E 10 L60 Line Phase Comparison System GE Multilin E 1 PROTOCOL APPENDIX E E ...
Страница 732: ...F 12 L60 Line Phase Comparison System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...
Страница 742: ...H 8 L60 Line Phase Comparison System GE Multilin H 3 WARRANTY APPENDIX H H ...