GBC StreamWire
7/23/2020
Repairs/Adjustments
4-173
11.
Electrical Components
REP 11.1 Main Control Board A Replacement
PARTS LIST ON PL 5.27
Use this procedure to remove and install the PCB Control Board(s).
Before replacing the Main Control board, attempt to retrieve the number
of Bind cycles.
Do GP 6.2.7 to display the number of Bind cycles.
Do GP 6.3.8 to store the eWire Log to USB.
Do GP 6.3.8 to store the eWire DATA back up to USB.
Removal Procedure
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 1.5
4. Disconnect all connectors from the Main. Note the connector
locations so you can replace them in the same position on the new
board.
5. Remove the M3 Screws (10) from the Main Control Board and
remove the Main Control Board.
Installation Procedure
1. Place the Main Control Board and Communication Board in
position.
2. Secure the Main Control board by tightening M3 Screws (10)
3. Re-connect all connectors to the Main Control Board. Refer to
Section 7, Wiring for details.
4. Do REP 1.5
5. Connect the Power Cord.
6. Power ON the eWire.
7. Perform GP 6.3.8 to load DATA backup
Содержание StreamWire
Страница 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Страница 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Страница 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Страница 343: ...General Procedures and Information 07 23 2020 GBC StreamWire 6 6 GP 6 1 4 Service Menu Flowchart...
Страница 420: ...GBC StreamWire 06 25 2019 General Procedures and Information 6 83 A C Board Test Points B Board Test Points...
Страница 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Страница 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Страница 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Страница 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Страница 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Страница 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Страница 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Страница 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Страница 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Страница 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Страница 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Страница 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Страница 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Страница 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...