
GBC StreamWire
7/23/2020
Repairs/Adjustments
4-27
REP 2.16 Alignment Sensor Replacement, S41
PARTS LIST ON PL 5.2
Use the following procedures to remove and install the Alignment
Carriage Home Sensor, S41.
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Raise the Upper Bypass Lid.
4. Remove the Sensor Bracket from the Steering Module by removing
the M3 Screws (2).
5. Disconnect the Cable Connector from the Sensor
6. Remove the Sensor from the Sensor Bracket by removing the M3
Screw.
Installation Procedure
1. Place the new Align Home Sensor into the Sensor Mounting
Bracket, using the tabs to align the sensor.
2. Connect the Sensor Cable to the new Sensor.
3. Re-attach the Sensor Mounting Bracket by tightening the M3
Screws.
5. Connect the Power Cord.
6. Power ON the eWire.
REP 2.17 Motor Driver (Stepper Driver) Replacement, M1 and M2
PARTS LIST ON PL 5.4
Use this procedure to remove and install a Motor Driver (7715275) for the
Bypass 1 and Bypass 2 Stepper Motors.
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to eWire.
2. Disconnect the Power Cord.
3. Do REP 1.1
4. Locate the appropriate Motor Driver (see PL 5.4).
5. Disconnect the Connectors (3)
Connectors
(3)
M1
M2
Содержание StreamWire
Страница 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Страница 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Страница 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Страница 343: ...General Procedures and Information 07 23 2020 GBC StreamWire 6 6 GP 6 1 4 Service Menu Flowchart...
Страница 420: ...GBC StreamWire 06 25 2019 General Procedures and Information 6 83 A C Board Test Points B Board Test Points...
Страница 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Страница 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Страница 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Страница 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Страница 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Страница 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Страница 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Страница 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Страница 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Страница 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Страница 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Страница 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Страница 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Страница 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...