Repairs/Adjustments
07/23/2020
GBC StreamWire
4-4
REPLACEMENTS
1. External Covers
REP 1.1 Top Cover Replacement
PARTS LIST ON PL 5.28
Use this procedure to remove and install the Top Cover Assembly.
Warning: Top Cover Assembly is very heavy. Use two people to
remove and use caution when removing the Top Cover Assembly.
Removal Procedure
WARNING
Do not perform repair activities with the power on or electrical power
supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury. See Section 0, page vi for other languages.
1. Switch power OFF to entire eWire.
2. Disconnect the Power Cord from eWire.
3. Raise the Upper Transport by releasing the latch.
4. Remove the M4 Screws (2) on the inside front of the Top Cover
5. Remove the M4 Screws (2) that secure the left side of the Top
Cover.
6. Remove the M4 Screws (2) that secure the right side of the Top
Cover.
7. Slowly lower the Upper Transport down with cover still resting in
place.
8. Carefully lift the entire top cover up and off the machine.
Installation Procedure
Use this procedure to install the top cover assembly
1. Switch power OFF to eWire.
2. Disconnect the Power Cord from eWire.
3. Lower the Upper Transport until the latch engages.
4. Lower the Top Cover Assembly onto the Upper Transport.
5. Lift up the Upper Transport by releasing the latch, while holding the
Top Cover in place on the Transport Frame.
6. Line up the screw holes in the frame with the threaded holes in the
Top Cover mounting brackets.
7. Install and tighten the Socket Head Screws (4) through the holes in
the frame.
8. Connect the Power Cord.
9. Switch power ON the eWire.
Содержание StreamWire
Страница 9: ...GBC StreamWire 07 23 2020 Service Manual ix Notes...
Страница 87: ...GBC StreamWire 07 23 2020 RTPS 2 72 Notes...
Страница 89: ...Book Quality 07 23 2020 GBC StreamWire 3 2 This page intentionally left blank...
Страница 343: ...General Procedures and Information 07 23 2020 GBC StreamWire 6 6 GP 6 1 4 Service Menu Flowchart...
Страница 420: ...GBC StreamWire 06 25 2019 General Procedures and Information 6 83 A C Board Test Points B Board Test Points...
Страница 428: ...GBC StreamWire 12 18 2018 Wiring Data 7 3 o System Wiring...
Страница 429: ...Wiring Data 12 18 2018 GBC StreamWire 7 4 o Element Feeder Module...
Страница 430: ...GBC StreamWire 12 18 2018 Wiring Data 7 5 o Element Transfer Module...
Страница 431: ...Wiring Data 12 18 2018 GBC StreamWire 7 6 o Knife Module...
Страница 432: ...GBC StreamWire 12 18 2018 Wiring Data 7 7 o Closer Module...
Страница 433: ...Wiring Data 12 18 2018 GBC StreamWire 7 8 o Holder Module...
Страница 434: ...GBC StreamWire 12 18 2018 Wiring Data 7 9 o Book Drawer...
Страница 435: ...Wiring Data 12 18 2018 GBC StreamWire 7 10 o Paper Transport Module...
Страница 436: ...GBC StreamWire 12 18 2018 Wiring Data 7 11 o Sheet Tappers Module...
Страница 437: ...Wiring Data 12 18 2018 GBC StreamWire 7 12 o Deflector Module...
Страница 438: ...GBC StreamWire 12 18 2018 Wiring Data 7 13 o Stacker Module...
Страница 439: ...Wiring Data 12 18 2018 GBC StreamWire 7 14 o Alignment Module...
Страница 440: ...GBC StreamWire 12 18 2018 Wiring Data 7 15 o Interlock AC and LCD Connections...
Страница 442: ...Installation Instructions 03 26 2019 GBC StreamWire 8 2 This page intentionally left blank...