Page 6 - 3
Applications
Explorer 107 Operation and Maintenance Manual
© GBC Pro - Tech December 1999
INFORMATION
Proceed to Webbing while waiting for the
heaters to come up to temperature.
i) When READY stops flashing in the temperature
displays for all the heating components, that is
your indication to proceed with webbing of the
laminator.
TEMPERATURE
212
o
F
H O T
READY
Stops flashing
j) Raise the upper heat assembly by turning the
roller handle counter clockwise.
CAUTION
Never leave the rollers in the down position
without rolling. Prolonged contact in one
area can form flat spots on the rollers.
k) Press
O F F
. The rollers stop turning.
M O T O R S P E E D
O N
O F F
R E V E R S E
1
2
3
4
5
6
7
8
9
10
Webbing
W A R N I N G
The following steps are performed while
the laminator is HOT! Avoid contact
with the heating components!
a) Lift the upper unwind shaft from the lateral
film adjustment side out of its support
saddle.
Lateral film adjustment