Installation Procedures
GDL 90 Installation Manual
560-1049-02 Rev. B
2-1
2 Installation
This section describes the installation of the GDL 90 including mounting, wiring, and connections. Post-
Installation configuration and checkout procedures are included in Section 3.
2.1 Pre-Installation
Information
Always follow acceptable avionics installation practices per FAA Advisory Circulars (AC) 43.13-1B,
43.13-2A, or later FAA approved revisions of these documents.
Follow the installation procedure in this section as it is presented for a successful installation. Read the
entire section before beginning the procedure. Prior to installation, consider the structural integrity of the
GDL 90 installation as defined in AC 43.13-2A, Chapter 1. Perform the post installation checkout before
closing the work area in case problems occur.
Complete an electrical load analysis in accordance with AC 43.13-1B, Chapter 11, on the aircraft prior to
starting modification to ensure aircraft has the ability to carry the GDL 90 load. Refer to Section 2.10 for
the power consumption of each GDL 90 mode of operation. Document the results of the electrical load
analysis on FAA Form 337.
The WAAS/GPS installation instructions have been prepared to meet the guidance material defined in
AC20-138A Airworthiness Approval of Global Navigation Satellite System (GNSS) Equipment.
CAUTION
Operating the GDL 90 without RF terminations on the Top or Bottom UAT Antenna
ports can result in equipment damage. Always operate the GDL 90 with the Top and
Bottom UAT Antenna ports terminated with a VSWR ratio of 3.0:1 or less.
2.2 Installation
Overview
A successful installation should start with careful planning, including determination of mounting location
for the GDL 90, cable routing, and other required modifications. Once the mounting location has been
determined, prepare the mounting tray for installation. It may be easier to complete the wiring harness
and attach the connectors to the tray upon installation.
2.3
Materials Not Supplied
2.3.1
Materials Required But Not Supplied
The GDL 90 is intended for use with standard aviation accessories. The following items are required for
the installation, but not supplied:
•
Wire (MIL-W-22759/16 or equivalent)
•
Shielded wire (MIL-C-27500 or equivalent)
•
Circuit Breakers
•
Ring Terminals (for grounding)
Содержание GDL 90
Страница 1: ...GDL 90 UAT Data Link Sensor Installation Manual October 2006 560 1049 02 Rev B ...
Страница 8: ...Table of Contents vi 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 42: ...Installation Procedures 2 24 560 1049 02 Rev B GDL 90 Installation Manual Figure 2 11 GDL 90 Center of Gravity ...
Страница 44: ...Installation Procedures 2 26 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 48: ...Limitations 560 1049 02 Rev B GDL 90 Installation Manual 3 4 Notes ...
Страница 62: ...Post Installation Configuration and Checkout 560 1049 02 Rev B GDL 90 Installation Manual 4 14 Notes ...
Страница 76: ...Periodic Maintenance 560 1049 02 Rev B GDL 90 Installation Manual 6 2 Notes ...
Страница 80: ...Certification Data A 4 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 82: ...Serial Interface Specifications B 2 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 83: ...Serial Interface Specifications GDL 90 Installation Manual 560 1049 02 Rev B B 3 ...
Страница 84: ...Serial Interface Specifications B 4 560 1049 02 Rev B GDL 90 Installation Manual ...
Страница 85: ...Serial Interface Specifications GDL 90 Installation Manual 560 1049 02 Rev B B 5 ...
Страница 86: ...Serial Interface Specifications B 6 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 87: ...Interconnect Diagrams GDL 90 Installation Manual 560 1049 02 Rev B C 1 APPENDIX C Interconnect Diagrams ...
Страница 88: ...Interconnect Diagrams C 2 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 92: ...Interconnect Diagrams C 6 560 1049 02 Rev B GDL 90 Installation Manual This Page Intentionally Left Blank ...
Страница 95: ......
Страница 96: ......