Post-Installation Configuration and Checkout
560-1049-02 Rev. B
GDL 90 Installation Manual
4-6
4.2.2.10 Loader command
The “
loader
” command is used to restart the GDL 90 in data loader mode. This is only used when
installing new software or features as instructed in a service bulletin.
4.2.2.11 Playaudio Command
The “
playaudio
” command causes the GDL 90 to output a 1 kHz tone. This allows for testing the audio
connections in the aircraft. The command takes a parameter of the number of seconds to play the tone. If
no parameter is given, the tone plays for 2 seconds.
> playaudio
The audio volume level is adjusted using the “Audio Volume” parameter in the APM. A setting of 20 to
25 is typical, but should be adjusted as necessary for each installation. Since the audible traffic alerts are
played at a lower volume than the test tone, the APM Audio Volume setting should be increased slightly
(approximately 5 points) above the level found using the test tone.
4.2.2.12 Reset Command
The “
reset
” command causes the GDL 90 to perform a software restart. This command can be used after
modifying the APM settings to restart the GDL 90 and make the new settings active.
>reset
4.2.2.13 Rxdata Command
The “
rxdata
” command displays information about the received UAT radio messages. The command
options are shown in the following chart.
<p> Description
Summary/Details/Off
SUMMARY = Display a count of the number of
each type of message received in each second.
DETAILS = Display detailed information about
each message received.
OFF = stop outputting rxdata status
Example: Summary of UAT messages received in last second:
>rxdata summary
Basics Received: 10
Longs Received: 5
Ground Uplinks Received: 2
This example shows that in the last second, there were 10 ADS-B Basic messages received, 5 ADS-B
Long messages received, and two Uplink messages received from a UAT ground station. This command
is useful to verify whether UAT messages are being received.
The detailed report includes the specific values for each data element in a received UAT message.
Содержание GDL 90
Страница 1: ...GDL 90 UAT Data Link Sensor Installation Manual October 2006 560 1049 02 Rev B ...
Страница 8: ...Table of Contents vi 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 42: ...Installation Procedures 2 24 560 1049 02 Rev B GDL 90 Installation Manual Figure 2 11 GDL 90 Center of Gravity ...
Страница 44: ...Installation Procedures 2 26 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 48: ...Limitations 560 1049 02 Rev B GDL 90 Installation Manual 3 4 Notes ...
Страница 62: ...Post Installation Configuration and Checkout 560 1049 02 Rev B GDL 90 Installation Manual 4 14 Notes ...
Страница 76: ...Periodic Maintenance 560 1049 02 Rev B GDL 90 Installation Manual 6 2 Notes ...
Страница 80: ...Certification Data A 4 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 82: ...Serial Interface Specifications B 2 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 83: ...Serial Interface Specifications GDL 90 Installation Manual 560 1049 02 Rev B B 3 ...
Страница 84: ...Serial Interface Specifications B 4 560 1049 02 Rev B GDL 90 Installation Manual ...
Страница 85: ...Serial Interface Specifications GDL 90 Installation Manual 560 1049 02 Rev B B 5 ...
Страница 86: ...Serial Interface Specifications B 6 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 87: ...Interconnect Diagrams GDL 90 Installation Manual 560 1049 02 Rev B C 1 APPENDIX C Interconnect Diagrams ...
Страница 88: ...Interconnect Diagrams C 2 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 92: ...Interconnect Diagrams C 6 560 1049 02 Rev B GDL 90 Installation Manual This Page Intentionally Left Blank ...
Страница 95: ......
Страница 96: ......