Post-Installation Configuration and Checkout
GDL 90 Installation Manual
560-1049-02 Rev. B
4-1
4 Post Installation Configuration & Checkout Procedures
Once the GDL 90 unit has been installed, configure the unit for the particular installation and then
complete these checkout procedures to verify proper operation for continued airworthiness. The steps
that are not applicable to a particular installation may be skipped. A checkout log sheet, included on page
4-20, is to be filled out during the checkout procedure. The completed checkout log sheet should be
maintained with the aircraft permanent records.
CAUTION
Operating the GDL 90 without RF terminations on the Top or Bottom UAT Antenna
ports can result in equipment damage. Always operate the GDL 90 with the Top and
Bottom UAT Antenna ports terminated with a VSWR ratio of 3.0:1 or less.
4.1
Mounting and Wiring Check
Verify that all cables are properly secured and shields are connected as the install drawings indicate.
Installation may require that you check the movement of the aircraft controls to verify that there is no
interference.
4.2
Equipment Setup and Configuration
Prior to system operation, the GDL 90 must be configured for the particular installation. The system
setup and checkout functions are accessed by connecting a PC or terminal to the GDL 90 serial
Maintenance port. Use the commands as described in the following sections, with these port settings:
•
38,400 baud
•
8-bit data
•
1 stop bit
•
no parity
•
no flow control
4.2.1
How to Use the GDL 90 Maintenance Port with HyperTerminal
1.
Position the aircraft so that it can see the GPS satellites, well away from any major structures.
2.
Connect a computer to the Maintenance Port.
3.
Startup the computer and run the HyperTerminal program, as follows:
a.
Click on Start, go to Programs > Accessories > Communications > HyperTerminal, and
click on "HyperTerminal".
b.
In the "Connection Description" dialog box, enter "GDL90". You can start up
HyperTerminal with this connection name the next time you need to use the Maintenance
Port. Click on OK.
c.
In the "Connect Using" dialog box, use the drop-down list to select your communication
port. Typically, it will be COM1.
d.
In the "Properties" box, for "Bits per Second" select 38400 from the drop-down list.
Leave the "Data bits" set to 8, "Parity" set to None, and "Stop bits" set to 1. Set "Flow
Control" to None, and then click OK.
4. HyperTerminal is now set up to communicate with the GDL 90. Power up the GDL 90, and you
should see some lowercase Xs displayed, then several lines of text. After that, when you press
the <enter> key, you should see the ">" prompt character display. If this doesn't work, use the
Properties menu button to double-check the HyperTerminal settings, and check the wiring to the
GDL 90 to be sure the Maintenance port is connected properly.
Содержание GDL 90
Страница 1: ...GDL 90 UAT Data Link Sensor Installation Manual October 2006 560 1049 02 Rev B ...
Страница 8: ...Table of Contents vi 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 42: ...Installation Procedures 2 24 560 1049 02 Rev B GDL 90 Installation Manual Figure 2 11 GDL 90 Center of Gravity ...
Страница 44: ...Installation Procedures 2 26 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 48: ...Limitations 560 1049 02 Rev B GDL 90 Installation Manual 3 4 Notes ...
Страница 62: ...Post Installation Configuration and Checkout 560 1049 02 Rev B GDL 90 Installation Manual 4 14 Notes ...
Страница 76: ...Periodic Maintenance 560 1049 02 Rev B GDL 90 Installation Manual 6 2 Notes ...
Страница 80: ...Certification Data A 4 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 82: ...Serial Interface Specifications B 2 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 83: ...Serial Interface Specifications GDL 90 Installation Manual 560 1049 02 Rev B B 3 ...
Страница 84: ...Serial Interface Specifications B 4 560 1049 02 Rev B GDL 90 Installation Manual ...
Страница 85: ...Serial Interface Specifications GDL 90 Installation Manual 560 1049 02 Rev B B 5 ...
Страница 86: ...Serial Interface Specifications B 6 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 87: ...Interconnect Diagrams GDL 90 Installation Manual 560 1049 02 Rev B C 1 APPENDIX C Interconnect Diagrams ...
Страница 88: ...Interconnect Diagrams C 2 560 1049 02 Rev B GDL 90 Installation Manual Notes ...
Страница 92: ...Interconnect Diagrams C 6 560 1049 02 Rev B GDL 90 Installation Manual This Page Intentionally Left Blank ...
Страница 95: ......
Страница 96: ......