![Galvanic Applied Sciences ProTech903 Скачать руководство пользователя страница 81](http://html1.mh-extra.com/html/galvanic-applied-sciences/protech903/protech903_operation-manual_3298733081.webp)
Revision 14
81
August 02, 2019
5.4.2 Analysis Data
The data for each analysis stream is presented. The data is the most recent or current results
for each stream. If an operation is in progress, the appropriate field will be highlighted in blue.
The field that is highlighted in yellow is the next operation to be executed in the queue. The
stream field definitions are listed in the table. If an operation is setup to run through the usage
of timers (located on the
Timers
tab (Section 5.18) the operation to be executed next will not
be highlighted until it has reached its start time and only after the current operation has
finished.
Table 5-6: Stream Fields
H2S
The
H2S
field either shows the current analysis reading if
highlighted blue or the last reading when that stream was run.
Total Sulfur
The
Total Sulfur
field either shows the current analysis reading if
highlighted blue or the last reading when that stream was run.
Reference 1
The
Reference 1
field either shows the current analysis reading if
highlighted blue or the last reading when that stream was run. A
reference gas is used as a periodic calibration check and cannot
change the gain
Reference 2
The
Reference 2
field either shows the current analysis reading if
highlighted blue or the last reading when that stream was run. A
reference gas is used as a periodic calibration check and cannot
change the gain
Zero
The
Zero
field either shows the current analysis reading if it
highlighted in blue or the last reading when that stream was run.
The Zero run is a way to check what the analyzer will read on a gas
that contains no H
2
S. Running a zero run will result in a zero offset
being calculated for the analyzer.
Calibration
The
Calibration
field either shows the current analysis reading if
highlighted blue or the last reading when that stream was run. The
calibration is used to automatically calibrate the analyzer and
calculate a new gain factor.
Gain
The present gain for the stream measurement
Offset
The present offset for the stream measurement
Содержание ProTech903
Страница 2: ......
Страница 96: ...Revision 14 96 August 02 2019 Figure 5 19 Event Log...
Страница 122: ...Revision 14 122 August 02 2019 Figure 5 38 Typical Modicon with Floating Point List...
Страница 124: ...Revision 14 124 August 02 2019 Figure 5 40 Expanded Modbus Nodes...
Страница 167: ...Revision 14 167 August 02 2019 Figure 9 1 DC Power Wiring Diagram Figure 9 2 AC Power Wiring Diagram...
Страница 168: ...Revision 14 168 August 02 2019 Figure 9 3 Total Sulfur Wiring Diagram Figure 9 4 AC DC Power Wiring Diagram...
Страница 169: ...Revision 14 169 August 02 2019 Figure 9 5 Solenoid Drivers Wiring Diagram Figure 9 6 Relays Wiring Diagram...
Страница 173: ...Revision 14 173 August 02 2019 Figure 9 13 Isolated RS 485 Port Figure 9 14 P17 RS232 Port to Ethernet Cable...
Страница 175: ...Revision 14 175 August 02 2019 Figure 9 17 Non Isolated 4 20 mA Inputs...
Страница 190: ...Revision 14 190 August 02 2019...