Revision 14
36
August 02, 2019
Figure 3-4: Dimensions - ProTech903 Class 1 Division 2 with Total Sulfur Option
Dimensions
(Front and Side View)
If the system is mounted on a panel, allow approximately 15” on the left hand side of to allow
the removal of the tape cover on the side of the chassis, and to allow easy access for tape
installation and removal.
If the system is installed in a cabinet, allow 6” on the left side for the installation of a vent line.
The optional sample conditioning system is typically mounted on the sample panel to the right
of the analyzer.
3.2.4 Area Classification Information
Class I, Division 1, Groups B, C & D
Class I, Division 2, Groups B, C & D
IECE
X
/ ATEX, Ex db [ia] ia op is II2B + H
2
T4 Gb, (T
amb
=-20° to 50°
The seals on Class I Division 1 analyzer are not poured at the factory.
Before starting use of the analyzer in a hazardous area, the seals must be
poured. All explosion proof covers (motor box, electronics enclosure,
110VAC to 24VDC power supply, and total sulfur furnace enclosure) must
be closed and sealed before powering up the analyzer in a classified area.
None of the explosion proof enclosures including the display cover should
be opened until the area is known to be non-hazardous.
3.2.5 Gas Requirements
If the analyzer is not provided with a sample conditioning system, the sample gas needs to be
clean and regulated at 15-20 psig.
3.3 Unpacking
To unpack the system:
•
Open the shipping container and remove all packing material and boxes. Visually inspect
the system and accessories packages to ensure that no major damage has occurred. If
damage has occurred, contact the shipping company and Galvanic Applied Sciences.
Place the small packages aside in a safe, secure storage area as they are not needed at
this stage of the system installation.
If any damage is visible do not proceed with the system installation. Do not
attempt to facilitate repairs yourself as this will negate and/or invalidate any possible
insurance claim or equipment warranty.
•
If the system is equipped with the total sulfur option, the furnace enclosure contains
packing material that is used to prevent damage to the system during shipping and a
steel rod in place of the quartz tube.
Содержание ProTech903
Страница 2: ......
Страница 96: ...Revision 14 96 August 02 2019 Figure 5 19 Event Log...
Страница 122: ...Revision 14 122 August 02 2019 Figure 5 38 Typical Modicon with Floating Point List...
Страница 124: ...Revision 14 124 August 02 2019 Figure 5 40 Expanded Modbus Nodes...
Страница 167: ...Revision 14 167 August 02 2019 Figure 9 1 DC Power Wiring Diagram Figure 9 2 AC Power Wiring Diagram...
Страница 168: ...Revision 14 168 August 02 2019 Figure 9 3 Total Sulfur Wiring Diagram Figure 9 4 AC DC Power Wiring Diagram...
Страница 169: ...Revision 14 169 August 02 2019 Figure 9 5 Solenoid Drivers Wiring Diagram Figure 9 6 Relays Wiring Diagram...
Страница 173: ...Revision 14 173 August 02 2019 Figure 9 13 Isolated RS 485 Port Figure 9 14 P17 RS232 Port to Ethernet Cable...
Страница 175: ...Revision 14 175 August 02 2019 Figure 9 17 Non Isolated 4 20 mA Inputs...
Страница 190: ...Revision 14 190 August 02 2019...