![Galvanic Applied Sciences ProTech903 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/galvanic-applied-sciences/protech903/protech903_operation-manual_3298733037.webp)
Revision 14
37
August 02, 2019
Remove this packing material before inserting the quartz tube or
powering up the system.
3.4
Installation of the Software
3.4.1 Computer Requirements
Table 3-1 shows the computer requirements for the application software.
Table 3-1: Computer Requirements for Application Software
Parameter
Requirement
Operating System
Microsoft
®
Windows 7, Windows 8, Windows 10
Memory
Minimum 512MB
Disk Drives
A CD ROM drive may be required to read the installation disk
but as of April 2016, the software, manual and QC
documentation will be placed on USB memory drives. A
minimum of 20 MB of space is required for installation on the
PC hard drive. Additional space is required to save analyzer
configurations and archive data.
USB Port
The analyzer to PC via a standard USB ‘A’ to USB ‘A’ cable
(included with the analyzer). The COM port used to connect to
the system cannot be used for any other purposes; otherwise
connecting to the system will not be possible.
Display
Minimum required resolution is 1024 x 768.
3.4.2 Install the Application Software
The application program that is included with the analyzer allows the operator to perform
analyses and configure all aspects of the analyzer’s operation. The application program is
capable of communicating with the analyzer through USB, or Ethernet (additional hardware
and setup software required)
To install the application software:
a) Insert the compact disk or USB memory stick that was included with the system into the
CD ROM drive or USB slot respectfully of the personal computer. Use Windows Explorer
to view the contents of the CD (Figure 3-5).
Содержание ProTech903
Страница 2: ......
Страница 96: ...Revision 14 96 August 02 2019 Figure 5 19 Event Log...
Страница 122: ...Revision 14 122 August 02 2019 Figure 5 38 Typical Modicon with Floating Point List...
Страница 124: ...Revision 14 124 August 02 2019 Figure 5 40 Expanded Modbus Nodes...
Страница 167: ...Revision 14 167 August 02 2019 Figure 9 1 DC Power Wiring Diagram Figure 9 2 AC Power Wiring Diagram...
Страница 168: ...Revision 14 168 August 02 2019 Figure 9 3 Total Sulfur Wiring Diagram Figure 9 4 AC DC Power Wiring Diagram...
Страница 169: ...Revision 14 169 August 02 2019 Figure 9 5 Solenoid Drivers Wiring Diagram Figure 9 6 Relays Wiring Diagram...
Страница 173: ...Revision 14 173 August 02 2019 Figure 9 13 Isolated RS 485 Port Figure 9 14 P17 RS232 Port to Ethernet Cable...
Страница 175: ...Revision 14 175 August 02 2019 Figure 9 17 Non Isolated 4 20 mA Inputs...
Страница 190: ...Revision 14 190 August 02 2019...