HOW TO OPERATE CRANE
★
Caution signboard
Be sure to hang a “caution signboard” such as on control levers while
either maintenance or inspection is being carried out, and do not try
operating the crane.
★
Be sure to replace consumable items according to the replace-
ment
criteria.
Failure to observe the replacement as specified may cause a break-
down and warranty will not be given even if it is within the period to be
applied.
★
When a part needs to be replaced or anything abnormal is found,
contact a UNIC service shop for consultation or for inspection or ask
repair as soon as possible.
WARNING
Store the outriggers as follows:
1
Turn the operation mode switch to “out-
rigger”.
The yellow lamp goes on.
2
Retract the vertical cylinders fully
first to retract the inner boxes to their
extremes.
3
Extract the set pins to rotate each out-
rigger manually to its storing position.
After that, insert the set pins back again
securely.
4
Return each outrigger control lever to
neutral position after the outriggers have
been stored.
●
Remarks
Outriggers may be lowered while crawling
for a long time which is not a fault.
Retracting inner box
Set pin
Retracting vertical
cylinder
Содержание URW376C4U -T Series
Страница 2: ......
Страница 8: ...MEMO...
Страница 17: ...4 1 4 DESCRIPTION OF CARRIER EQUIPMENT 17 19 8 10 6 14 7 9 5 2 1 4 3 14 18 15 17 11 12 16 13 20...
Страница 19: ...5 1 5 DESCRIPTION OF CRANE EQUIPMENT 2 19 3 4 5 6 19 7 1 9 10 8 11 18 22 24 23 17 25 16 20 21 12 13 14 15...
Страница 30: ...MEMO...
Страница 128: ...MEMO...
Страница 146: ...MEMO...
Страница 154: ......
Страница 155: ......
Страница 156: ...HEAD OFFICE Nihonbashi nishikawa Bldg 5 3 Nihonbashi 1 chome Chuo ku Tokyo 103 0027 Japan...