
3-4
SAFETY PRECAUTIONS ON CRANE OPERATION
After operation
1
Make sure that the booms, the outrig-
gers, and the hook have been stored
before crawling the crane.
★
Temperature of both hydraulic and
gear oil is high immediately after crane
operation so that accumulated high pres-
sure still remains.
Removing filling cap, draining oil, or replac-
ing oil filter while temperature is still high
allows hydraulic and/or gear oil to spout out
and a scald may result.
2
Do not carry out maintenance and
inspection while temperature of either
hydraulic oil or gear oil is still high.
3
Since temperature on the engine and the
hood in the side is too high immediately
after crane work, touch them after they have
been cooled down.
Содержание URW376C4U -T Series
Страница 2: ......
Страница 8: ...MEMO...
Страница 17: ...4 1 4 DESCRIPTION OF CARRIER EQUIPMENT 17 19 8 10 6 14 7 9 5 2 1 4 3 14 18 15 17 11 12 16 13 20...
Страница 19: ...5 1 5 DESCRIPTION OF CRANE EQUIPMENT 2 19 3 4 5 6 19 7 1 9 10 8 11 18 22 24 23 17 25 16 20 21 12 13 14 15...
Страница 30: ...MEMO...
Страница 128: ...MEMO...
Страница 146: ...MEMO...
Страница 154: ......
Страница 155: ......
Страница 156: ...HEAD OFFICE Nihonbashi nishikawa Bldg 5 3 Nihonbashi 1 chome Chuo ku Tokyo 103 0027 Japan...