
0-2
TABLE OF CONTENTS
8. HOW TO REFER TO WORKING
RANGE CHART AND RATED LOAD
CHART
Working range chart ……………………… 8- 1
Rated load chart …………………………… 8- 2
9. DESCRIPTION OF EACH
CONTROL DEVICE
Overwinding alarm ………………………… 9- 1
Automatic stop for overwinding …………… 9- 2
Boom angle chart ………………………… 9- 4
Warning horn ……………………………… 9- 8
Retaining mechanism for slinging wire rope
9- 8
Automatic stop for leaving minimum wire rope
(With wire rope retaining roller) …………… 9- 8
Load meter ………………………………… 9- 9
Specifications on turn over prevention device … 9-11
10. HOW TO OPERATE CARRIER
Designation of each control lever
and its location …… 10- 1
Preparation before operation ……………… 10- 2
Precautions before operation
(air-bleeding procedures) …… 10- 5
How to operate …………………………… 10- 6
How to Crawl ……………………………… 10- 9
How to fasten carrier when in transportation 10-14
11. HOW TO OPERATE CRANE
Designation of each control lever
and its location……… 11- 1
Preparation before operation ……………… 11- 2
Procedures to set up outriggers …………… 11- 3
How to operate boom for derricking
(raising and lowering) …… 11- 7
How to hoist and lower the hook …………… 11- 8
How to telescope boom …………………… 11-10
How to slew boom ………………………… 11-12
SETUP OF THIS MANUAL
URW376C4U-T series …………………… 0- 4
1. FOR SAFETY OPERATION
Request to customers ……………………… 1- 1
2. SAFETY PRECAUTIONS ON
CARRIER OPERATION
Before operation …………………………… 2- 1
During operation …………………………… 2- 2
When loading and unloading ……………… 2- 4
After operation …………………………… 2- 4
3. SAFETY PRECAUTIONS ON
CRANE OPERATION
Before operation …………………………… 3- 1
During operation …………………………… 3- 2
After operation …………………………… 3- 4
4. DESCRIPTION OF CARRIER
EQUIPMENT
……………………… 4- 1
5. DESCRIPTION OF CRANE
EQUIPMENT
……………………… 5- 1
6. NAME PLATES
Description of name plates (Stickers) ……… 6- 1
Stickers in detail …………………………… 6- 2
7. DEFINITION OF TERMS
Outrigger extension ………………………… 7- 1
How boom-sections are extended ………… 7- 3
Net rated load ……………………………… 7- 4
Rated load ………………………………… 7- 4
Lifting capacity …………………………… 7- 4
Working radius …………………………… 7- 4
Boom length ……………………………… 7- 4
Boom angle ………………………………… 7- 4
Lift above ground ………………………… 7- 4
Содержание URW376C4U -T Series
Страница 2: ......
Страница 8: ...MEMO...
Страница 17: ...4 1 4 DESCRIPTION OF CARRIER EQUIPMENT 17 19 8 10 6 14 7 9 5 2 1 4 3 14 18 15 17 11 12 16 13 20...
Страница 19: ...5 1 5 DESCRIPTION OF CRANE EQUIPMENT 2 19 3 4 5 6 19 7 1 9 10 8 11 18 22 24 23 17 25 16 20 21 12 13 14 15...
Страница 30: ...MEMO...
Страница 128: ...MEMO...
Страница 146: ...MEMO...
Страница 154: ......
Страница 155: ......
Страница 156: ...HEAD OFFICE Nihonbashi nishikawa Bldg 5 3 Nihonbashi 1 chome Chuo ku Tokyo 103 0027 Japan...