
10-2
Preparation before operation
HOW TO OPERATE CARRIER
WARNING
★
Heavy-duty operation of the crane during an initial period after the
start of operation may deteriorate its performance in a shorter time.
Take approximately 100 hours after the start of operation as a breaking-
in period during which abrupt start and acceleration, and continuous
operation under heavy load must be avoided.
CAUTION
★
Ventilate well when starting the engine in a small limited area or
indoors.
★
Do not start the engine from the outside of the operator’s seat.
★
Confirm the safety around the crane working site before starting the
engine.
2
Make sure that both crawling levers (left
and right) are at their neutral positions.
1
Press the pedal to release the interlock
for crane-crawl operation and hold it.
(When you take your foot off the pedal,
crawling levers are locked automatically.)
To “Crawl”
Содержание URW376C4U -T Series
Страница 2: ......
Страница 8: ...MEMO...
Страница 17: ...4 1 4 DESCRIPTION OF CARRIER EQUIPMENT 17 19 8 10 6 14 7 9 5 2 1 4 3 14 18 15 17 11 12 16 13 20...
Страница 19: ...5 1 5 DESCRIPTION OF CRANE EQUIPMENT 2 19 3 4 5 6 19 7 1 9 10 8 11 18 22 24 23 17 25 16 20 21 12 13 14 15...
Страница 30: ...MEMO...
Страница 128: ...MEMO...
Страница 146: ...MEMO...
Страница 154: ......
Страница 155: ......
Страница 156: ...HEAD OFFICE Nihonbashi nishikawa Bldg 5 3 Nihonbashi 1 chome Chuo ku Tokyo 103 0027 Japan...