![Fuji Electric FVR-C11S-7EN Series Скачать руководство пользователя страница 61](http://html1.mh-extra.com/html/fuji-electric/fvr-c11s-7en-series/fvr-c11s-7en-series_instruction-manual_2341873061.webp)
5 Selecting Function
5-21
FVR-C11S-EN
5
Change during operation: X = impossible,
= possible (enabled by using
),
= possible (enabled by using
)
PID control
(Feedback signal select)
This function selects a PID control feedback sig-
nal.
Terminal 12 (0 to +10VDC)
Terminal C1 (4 to 20mADC)
Terminal 12 (+1 to +5VDC)
PID control (P-gain)
This function sets a P-gain.
to
P-gain from 0.01 to 10.0
times (1 to 1000%)
(in increment of 0.01 step)
PID control (I-gain)
This function sets an integral time.
: No integration
to
: Integral time 0.1 to 999s
(in 0.1s step for 99.9s or less, 1s step for 100s or
more)
PID control (D-gain)
This function sets a derivative time.
: No derivative
to
: Derivative time 0.01 to
10.0s (in 0.01s step)
PID control (Feedback filter)
This function sets a filter time constant of PID
feedback.
to
: Time constants 0.0 to 60.0s
(in 0.1s step)
Factory setting
Change during
operation
1
X
Factory setting
Change during
operation
0.01
Factory setting
Change during
operation
0.0s
H21
0
1
2
H22
0. 0 1
1 0. 0
H23
0. 0
0. 1
9 9 9
Factory setting
Change during
operation
0.00s
Factory setting
Change during
operation
0.5s
H24
0. 0 0
0. 0 1
1 0. 0
H25
0. 0
6 0. 0