![Fuji Electric FVR-C11S-7EN Series Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/fuji-electric/fvr-c11s-7en-series/fvr-c11s-7en-series_instruction-manual_2341873029.webp)
2 Installation and Connection
2-15
FVR-C11S-EN
2
1) Use this connection to start, stop the opera-
tion and set the frequency with external sig-
nals. 0 to 10V DC can be set while function
F01 is set to 1 and +4 to +20mA DC can be
set while function F01 is set to 2. Set function
F02 to 1.
2) Set SW7 at CM
3) Remove the jumper between the P1 and P(+)
terminals before connecting the optional pow-
er-factor correcting DC reactor.
4) Connect the surge absorber in parallel to coils
(such as coils of the magnetic contactor and
solenoid) near the inverter.
5) Use twisted or shielded wire as control signal
wire. Connect the shield to the ground termi-
nal.