
Settings on the Fronius Symo GEN24 inverter website:
1
Configure the primary meter at the feed-in point in the “Device configuration" →
“Components” menu.
2
Configure the secondary meter in the "Device configuration" → "Components" menu.
Settings in the system monitoring of the Fronius SnapInverter:
1
Configure the primary meter at the feed-in point in the "Settings " → "Meter" menu.
2
Activate the limit for the entire system in the "DNO Editor" → "Dynamic power reduc-
tion" menu. Enter the DC nominal output of the entire PV system in the "Total DC
system power" input field. Enter the percentage value (50%, 60% or 70%) in the
"Max. grid feed-in power" input field.
I/O power man-
agement
General
In this menu item, settings relevant for an electricity company (DNO) are made. An ef-
fective power limitation in % and/or a power factor limitation can be set.
IMPORTANT!
The service password must be entered in order to adjust settings in this menu item. Set-
tings in this menu area must only be made by trained and qualified personnel.
"
Input pattern
" (assignment of individual I/Os)
1 click = white (contact open)
2 clicks = blue (contact closed)
3 x clicks = grey (not used)
"
Power factor (cos φ)
"
"
ind
" = inductive
"
cap
" = capacitive
"
DNO feedback
"
when the rule is enabled, output “DNO feedback” (pin 1 recommended) must be con-
figured (e.g. for operating a signalling device).
For "
Import
" or "
Export
", the data format *.fpc is supported.
Control priorities
For setting the control priorities for the ripple control signal receiver, the feed-in limitation
and control via Modbus.
94
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......