I/O power man-
agement settings
- 1 relay
DNO Rules
V+/GND
IO
I
not used
DNO Feedback
Rule 1
0
2
4
6
8
10
1
3
5
7
9
11
100
DNO Feedback
Active Power
1
cap
Power Factor (cos φ)
Rule 2
0
2
4
6
8
10
1
3
5
7
9
11
0
DNO Feedback
Active Power
1
cap
Power Factor (cos φ)
EXPORT
IMPORT
0
0
2
3
4
5
6
7
8
9
10
11
1
2
4
1
3
5
6
9
11
7
10
8
v
+
v
+
GND
GND
I/O Power Management
None
None
None
None
None
None
None
None
IO control
None
None
None
Autotest
(CEI 0-21)
Description
The 'Autotest' can be used to check the protective function required by the Italian stand-
ard for monitoring the voltage and frequency limits as well as the trip limits of the inverter
during commissioning. During normal operation, the inverter constantly checks the cur-
rent voltage and frequency actual value of the grid.
After the start of the autotest, various individual tests run automatically one after the oth-
er. Depending on grid conditions, the duration of the test is approx. 15 minutes.
IMPORTANT!
The inverter may only be commissioned in Italy after a successful autotest (CEI 0-21). If
the autotest is not passed, no feed-in operation may take place. If the autotest is started
once, it must be completed successfully. The autotest cannot be started during emer-
gency power mode.
VAC inner
limit max
Test to check the maximum voltage in the phases
VAC inner
limit min
Test to check the minimum voltage in the phases
FAC inner
limit max
Test to check the maximum frequency
102
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......