Closing and commissioning the inverter
Closing the in-
verter's connec-
tion area/housing
cover, and com-
missioning
NOTE!
The housing cover is fitted with a lock for safety reasons, which allows the hous-
ing cover on the inverter to be pivoted only when the DC disconnector is switched
off.
▶
Only clip and pivot the housing cover onto the inverter when the
DC disconnector
is switched off
.
▶
Do not use excessive force to clip in and pivot the housing cover.
1
Place the cover on the connection area.
Tighten the five screws by rotating them
180° to the right in the indicated order us-
ing a screwdriver (TX20).
2
Clip the housing cover onto the inverter
from above.
Press on the lower part of the housing
cover and tighten the two screws 180° to
the right using a Torx screwdriver (TX20).
Turn the DC disconnector to the "On"
switch position. Switch on the automatic
circuit breaker. For systems with a battery,
observe the switch-on sequence according
to chapter
.
IMPORTANT!
The DC disconnector in the "On" switch
position automatically opens the WLAN
access point (AP) when starting for the
first time.
Alternatively, the WLAN access point can
be opened with the optical sensor, see
chapter
on page
Starting the in-
verter for the first
time
When using the inverter for the first time, various setup settings must be configured.
If the setup process is cancelled before the process is complete, any data that has been
input up to this point is lost and the start screen with the installation wizard is shown
again. If the process is interrupted, such as in the event of a power outage, the data is
saved. Commissioning may be continued from the point at which the process was inter-
rupted once the power supply has been restored. If the setup was interrupted, the invert-
72
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......