Protection of people and equipment
Central grid and
system protec-
tion
The inverter offers the option to use the integrated AC relays as coupling switches in
conjunction with a central grid and system protection unit (in accordance with VDE-AR-N
4105:2018:11 §6.4.1). For this purpose, the central trigger device (switch) must be integ-
rated into the WSD chain as described in the chapter "WSD (Wired Shut Down)".
WSD (wired shut-
down)
The wired shutdown (WSD) interrupts the inverter feeding energy into the grid if the trig-
ger device (switch) has been activated.
If an inverter (secondary device) fails, it is bypassed and the other inverters continue op-
erating. If a second inverter (secondary device) or the inverter (primary device) fails, the
operation of the entire WSD chain is interrupted.
For installation, see
Installing the WSD (wired shutdown)
RCMU
The inverter is equipped with a universal current-sensitive residual current monitoring
unit (RCMU = Residual Current Monitoring Unit) in accordance with IEC 62109-2.
This device monitors residual currents from the PV module to the AC output of the invert-
er and disconnects the inverter from the grid in the event of unauthorised residual cur-
rent.
Surge protective
device
The inverter is equipped with an integrated surge protective device on the DC and AC
side in accordance with IEC 62109-2. The surge protective device protects the system
against damage in the event of an overvoltage.
25
EN
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......