
3
Enter the file name in the input field and click on the "Save" button.
The PDF is created and displayed.
Licence manager
The licence file contains the performance data and the scope of functions of the inverter.
When replacing the inverter, power stage set or data communication area, the licence file
must also be replaced.
Licensing - online (recommended):
An Internet connection and completed configuration on Solar.web is required.
1
Complete the installation work (see chapter
Closing the inverter's connection
area/housing cover, and commissioning
).
2
Connect to the website of the inverter.
3
Enter the serial number and verification code (VCode) of the defective and replace-
ment unit. The serial number and the VCode can be found on the rating plate of the
inverter (see chapter
).
4
Click on the "Start online licensing" button.
5
Skip the Terms of use and Network settings menu items by clicking on "Next".
The licence activation starts.
Licensing - offline:
There must be no Internet connection for this. When licensing offline with an established
internet connection, the licence file is automatically uploaded to the inverter. Therefore,
when uploading the licence file, the following error occurs: "The licence has already been
installed and the wizard can be closed".
1
Complete the installation work (see chapter
Closing the inverter's connection
area/housing cover, and commissioning
).
2
Connect to the website of the inverter.
3
Enter the serial number and verification code (VCode) of the defective and replace-
ment unit. The serial number and the VCode can be found on the rating plate of the
inverter (see chapter
).
4
Click on the "Start offline licensing" button.
5
Download the service file onto the end device by clicking on the "Download service
file" button.
6
Open the website
and log in with your user name
and password.
7
Drag or upload the service file into the "Drop service file here or click to upload” field.
8
Download the newly generated licence file onto the end device using the "Download
license file" button.
9
Go to the inverter website and drag the licence file into the "Drag&Drop licence file
here" field, or select it via "Select license file".
The licence activation starts.
Support
Activate support user
1
Click the "Activate support user" button.
The support user is activated.
IMPORTANT!
The support user only allows Fronius Technical Support to implement settings on the in-
85
EN
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......