
Scope of supply
(1)
Housing cover
(2)
Inverter
(3)
Mounting bracket (illustration)
(4)
Quick Start guide
(5)
2x ferrite ring with holder
Intended use
The inverter is designed to convert direct current from PV modules into alternating cur-
rent and feed this power into the public grid. A backup power mode* is possible provided
that appropriate cabling has been installed.
The following are considered improper use:
-
Utilisation for any other purpose, or in any other manner
-
Alterations to the inverter are not permitted unless expressly recommended by
Fronius
-
Installation of components is not permitted unless expressly recommended or sold
by Fronius
The manufacturer is not responsible for any damage resulting from improper use.
All warranty claims are considered void in such cases.
Intended use also means:
-
Carefully reading and obeying all the instructions, as well as safety and danger no-
tices in the Operating Instructions
-
Installation in accordance with chapter "
When configuring the photovoltaic system, make sure that all components of the photo-
voltaic system are operating exclusively within their permissible operating range.
Observe all measures recommended by the PV module manufacturer to permanently
maintain the PV module properties.
Observe the grid operator's regulations for energy fed into the grid and connection meth-
ods.
The Fronius GEN24 inverter is a grid-connected inverter with a backup power function –
it is not a stand-alone inverter. The following restrictions must therefore be observed in
backup power mode:
-
Backup power mode may be in operation for at least 2000 hours
-
Backup power mode may be in operation for more than 2000 operating hours if 20%
of the duration of the inverter's grid power feed operation is not exceeded at the rel-
evant time.
*
Depending on the device variant, suitable battery, appropriate wiring, settings
and local standards and guidelines.
14
Содержание Symo GEN24 3.0
Страница 2: ......
Страница 11: ...General information 11...
Страница 12: ...12...
Страница 31: ...Backup power variant PV Point OP 31...
Страница 32: ...32...
Страница 34: ...34...
Страница 35: ...Installation 35...
Страница 36: ...36...
Страница 77: ...Settings website of the inverter 77...
Страница 78: ...78...
Страница 104: ...104...
Страница 105: ...Options 105...
Страница 106: ...106...
Страница 115: ...2 Set the DC disconnector to the On switch position Switch on the automatic circuit breaker 115 EN...
Страница 116: ...116...
Страница 117: ...Appendix 117...
Страница 118: ...118...
Страница 132: ...132...
Страница 133: ...Circuit diagrams 133...
Страница 134: ...134...
Страница 135: ...Circuit Diagram PV Point OP Circuit Diagram 135 EN...
Страница 136: ...Fronius Symo GEN24 and BYD Battery Box Premi um HV Circuit Diagram 136...
Страница 137: ...Wiring diagram surge protective device SPD Circuit Diagram 137 EN...
Страница 138: ...138...
Страница 139: ...Dimensions of the inverter 139...
Страница 140: ...140...
Страница 141: ...Fronius Symo GEN24 3 5 kW Fronius Symo GEN24 3 5 kW 141 EN...
Страница 142: ...142...
Страница 143: ...143 EN...
Страница 144: ......